B1 flash mortar

immediately-binding flash mortar für all kinds of fillings and repairing (processing time: 30 sec.)

  • fire safety mortar (construction material class A1)
  • plastic consistence, easy to form, depending on the temperature can bear weight after a few minutes
  • impermeable to water and to great extent impermeable to oil, at the same time anticorrosive
  • high initial firmness
  • consumption: 1,75 kg/(m²⋅mm)
  • mixing time: 30 sec.
  • compressive strength after 1h: ≥ 2,5 N/mm²
  • compressive strength after 28 d: ≥ 55 N/mm²
CE marking
B1

Request test certificates

If you need further test certificates, please do not hesitate to contact us.
Tel. +49 201 685040
Email: pruefzeugnisse@pagel.de

Please enter your name.
Please enter a subject.
Please enter a valid phone number.
Please enter a message.

I have read the data protection declaration and I consent to the data I have provided being electronically collected and stored. My data is used only strictly for the processing and answering of my request.

You must accept the Terms and Conditions.

properties

  • immediately-bonding flash mortar for all kinds of filling and repairing works (processing time between 30 sec.)
  • specially easy to process, just mix with water
  • plastic consistence, easy to mould. Depending on the temperature, it can bear weight after only a few minutes
  • indispensable installation help for all installers and building workers
  • high initial strength
  • cement-bound, without efflorescences or corrosion damage to iron parts
  • impermeable to water and to great extent impermeable to oil, at the same time anticorrosive
  • satisfies the requirements of the type A1 construction materials (non-flammable) according to the ruling 2000/605/EG of the European Commission, September 26th 2000 (published in official journal, L258)

fields of application

  • filling of anchorings, door anchorings, railings, anchoring bolts, machine parts, steel pillars, etc.
  • sealing of water penetrations
  • after-sealing and filling of holes
  • filling of cavities on tile-laying works
  • filling of holes on all kinds of installation works, such as locksmith, electricity installation, masonry, painting, etc.
  • sealing of surfaces of cracks in brickworks in order to fill the cracks with other crack-filling materials